KP Transmission & Grid System Company is state of art company established by the Govt of Khyber Pakhtunkhwa having authorized capital of Rs. 100 Million
NEPRA issued license on 26.02.2021
Registered with SECP on 04.09.2020 as Multi-Member Company (MMC)
KP Transmission & Grid Company can lay down all kind of transmission & distribution network within the province
Company will provide cheaper electricity to industrial areas
Independent BOD of Company is established
Currently working under the Power & Energy Department KPK
Business Domain
KP PROVINCE To provide a flexible High Voltage (HV) & Extra High Voltage (EHV) Transmission system to suit needs and requirements of the province
PEDO To facilitate PEDO HPPs with planned power evacuation of 7300 MW from KP various regions Chitral, Dir, Swat, Kohistan and Mansehra in the next 5-20 years.
KPEZDMC Facilitate KPEZDMC for power supply to its Economic Zones (EZ) and Special Economic Zones with nearly 880 MW in the next 3-5 years.
NTDC The province own generation and transmission will greatly relief National Transmission and Dispatch Company (NTDC) from overloading’s, voltage fluctuation and break downs
PESCO KP max load in June 2021 was 3700 MW with a major share of 2200 MW from NTDC. KP T&GSC will play a major role to relief NTDC and PESCO with MW generated within the Province